How Long Will the Kitchen Remodel Take from Start to Finish

Published On: October 27, 2025
Category: Kitchen Remodel

Author: Jose Esparza

How Long Will the Kitchen Remodel Take from Start to Finish infographic

A kitchen remodel is an exciting home upgrade that promises enhanced function and style. One of the most common and important questions homeowners ask is: How long will the kitchen remodel take from start to finish? The true answer is that the timeline varies significantly based on the project’s scope. A minor cosmetic refresh is much quicker than a full renovation involving structural changes.

For a simple renovation with no layout changes, you might expect a timeline of 4 to 8 weeks. However, a full-scale remodel that includes new plumbing, electrical, and custom features can take between three to five months. It is critical to set realistic expectations and understand the various phases involved.

Family-owned general contractors providing an accurate timeline for How long will the kitchen remodel take from start to finish.

The Three Key Phases of a Kitchen Remodel

A successful project is broken down into distinct stages, each with its own time commitment. Understanding these steps is key to knowing how long will the kitchen remodel take from start to finish.

Phase 1: Planning, Design, and Procurement

This initial stage is the foundation of your entire project and should not be rushed. It typically takes 1 to 3 months, depending on your decision-making speed.

  • Design and Layout Finalization: You work with your contractor to finalize the design, layout, and material selections.
  • Permitting: Securing necessary permits for structural, plumbing, or electrical changes can take weeks, depending on local regulations.
  • Material Ordering: Long-lead items, especially custom cabinetry, can take 8 to 12 weeks or more to arrive. Ordering these early is essential to prevent construction delays.
Professional contractors installing custom cabinets and countertops

Phase 2: Demolition and Rough Construction

This is the physical start of the renovation, making your vision a reality. This phase generally takes about 4 to 6 weeks.

  • Demolition: Removing the old cabinets, appliances, and walls usually takes 1 to 2 weeks.
  • Structural and Rough-In Work: This involves any necessary framing and running new plumbing and electrical lines.
  • Inspections and Drywall: Inspections are required to ensure the rough-in work meets code. After passing, drywall is hung, taped, and painted.
new  lighting installed in a kitchen remodeling in visalia, ca

Phase 3: Installation and Finishing Touches

This is where your new kitchen takes shape and typically spans 4 to 8 weeks.

  • Cabinet Installation: Installing the new cabinetry is a critical step, often taking several days to a week.
  • Countertops: After cabinets are installed, the countertops are templated, fabricated, and then installed, which can take 2 to 3 weeks.
  • Final Installation: Appliances, plumbing fixtures, lighting, and the backsplash are all installed in this stage.
  • Punch List and Walkthrough: Your contractor completes any minor touch-ups before the final walk-through.

For clients in the Central Valley, A-1 Contractors focuses on managing all these complex stages with transparency and expertise. Our experience with home remodeling projects ensures a smooth process.

Beautifully finished kitchen transformation in visalia, ca

Key Factors That Influence the Timeline

The ultimate duration of your renovation and how long will the kitchen remodel take from start to finish depends heavily on several variables.

 

The Scope of the Work

  • Cosmetic Update: Simple changes like new countertops and a backsplash are the fastest, often taking just a few weeks.
  • Full Layout Change: Moving walls, plumbing, or electrical lines adds complexity and significantly extends the timeline. These structural changes often require permits.

Customization and Material Lead Times

  • Custom Selections: Custom cabinets, high-end appliances, and unique countertop materials often have long lead times, which can delay the project.
  • Supply Chain Issues: Unexpected back orders or shipping delays can halt the entire process, making early ordering essential.
beautiful new kitchen installed by the best general contractors in visalia, ca

Unforeseen Issues

  • Hidden Problems: Once demolition begins, contractors may discover hidden issues in older homes, such as mold, water damage, or outdated, non-code-compliant wiring. These must be addressed before work can continue, causing potential delays.
  • Mid-Project Changes: Making design changes after construction has started is the number one cause of delays and increased costs.

To help you manage the financial side of a remodel, A-1 Contractors offers flexible financing options.

a-1 contractors dba a-1 electric contractors truck  in Visalia, CA

The A-1 Advantage

For homeowners considering a full transformation, a Home Remodeling project, or even adding an ADU to increase property value, understanding the timeline is key.

The team at A-1 Contractors is ready to discuss your unique Kitchen Remodel vision and provide a detailed timeline for your specific project.

Frequently Asked Questions

How long does a kitchen remodel take on average?

A simple kitchen renovation usually takes 1 to 2 months. A major remodel, involving structural changes and full customization, typically lasts between 3 to 5 months from the start of demolition to completion.

Can I live in my home during the kitchen remodel?

In many cases, yes, you can remain in your home. For large remodels, temporary relocation might be recommended, but your contractor will work to minimize disruption.

What is the longest part of a kitchen renovation?

The longest part of the process is often the planning and ordering phase, as custom cabinets and specialized materials can take 8 to 12 weeks or more to arrive. During the active construction phase, cabinet and countertop installation is a critical path that takes a significant portion of the time.

What causes the most common delays in a kitchen remodel timeline?

Common delays stem from material backorders, unexpected issues found during demolition (like water damage or old wiring), and waiting for city permits and inspections. Making changes to the design after construction has started will also cause delays.

Why should I hire a general contractor for a kitchen remodel?

A general contractor, like A-1 Contractors, manages the entire process—including coordinating all specialized trades, handling permits, and adhering to code—which is essential for keeping a complex project on track and reducing your stress. They ensure the quality of craftsmanship from start to finish.

Jose Esparza, the visionary CEO of A-1 Contractors, brings over 40 years of unparalleled experience to the construction industry

About the Author

Jose Esparza, the visionary CEO of A-1 Contractors, brings over 40 years of unparalleled experience to the construction industry. A true testament to resilience and dedication, Jose is a self-taught professional who began his entrepreneurial journey at the age of 19 as a single father of three boys.

His journey from a family of field workers to leading a successful corporation is a story of unwavering commitment to growth and excellence.

We’ve donated materials to Sanctuary For All to help rebuild shelters damaged by thieves. Please join us in supporting this vital local rescue.